Project:  PEMEX Exploración y Producción

Project Images


Baker Hughes de México/Centrilift

Engineering, procurement and construction (EPC) for Pemex ESP Project.


Engineering encompassed design of all topsides electrical installation of Centrilift downhole pump system for five (5) platforms. The ESP project was a sub-marine cable powered system distributed at 35KV from turbine driven generation at the central complex and routed throughout the EK-Balam field. Each individual platform, five (5) in total, required extensive new construction to provide redundant isolation and filtering for the variable frequency drive controlled ESP pumps. The variable frequency drives operated at 480VAC with phase shift capabilities and the downhole pump operated at 5KV.

MEITEC’s scope included procurement of all topsides equipment and export to Ciudad del Carmen, Campeche, México.

Construction required ex-patriate MEITEC supervision and personnel, local personnel and sub-contract personnel to retro fit the five (5) platforms from previously solar powered to sub-marine cable powered systems.



Contact us for more information.
 
Copyright © 2024 MEITEC. All Rights Reserved