Project:  Noble "John Sandifer"

Project Images



Summer 2007 shipyard project.


Prior to construction, MEITEC’s staff made a visit to Ciudad Del Carmen, and subsequently to the rig and reviewed the existing drawings, preliminary new drawings and rig systems to develop a scope of work, and assist in the new upgrade. The site visit incorporated extensive digital documentation.

MEITEC’s engineering included design of various electrical/ instrument systems. Inclusive of tray routing, bulkhead penetrations, detailed termination diagrams, and lighting plans.

MEITEC’s engineering, design, and construction included removal of electrical facilities for a new draw works, switchboards, MCC’s panel boards, 2-1,500 Kva transformers, shaker/auger, renew Koomey unit, refurbish festoon, replace drillers cabin, replace/upgrade to four generators, add third mud pump, upgrade lifeboats, renew solids control module. New trip tank, and pump skid. MEITEC also provided 8 personnel for start-up assistance in México, for 2 weeks.



Contact us for more information.
 
Copyright © 2024 MEITEC. All Rights Reserved