Skip Navigation
Celebrating 29 years in 2024!

Project:  Faith Ranch Project

Project Images



Construct and install a 25KV power distribution system.


General scope of work was to construct and install a 25KV power distribution system that consists of underground elements to well pad sites based upon the Faith Bonita, and Faith San Pedro corridors.
This project was complete in June 2012 without a single fault in any of our load break terminations and in-line splices after all hi-pot testing was completed and additionally, it was confirmed that the integrity of our load break termination was flawless.
Listed below are the items installed:
  • 96,000 feet of 25KV Cable
  • 55 Splices
  • 405 Load Break Elbows
  • 57 Pedestals
  • 17 Transformers on 17 Pads
  • 93 Ground Rods
  • 1 Pole mounted Recloser switch
  • 1 Pole mounted 25KV to 240 V Transformer
  • 1 Pole mounted Control Panel


Contact us for more information.
 
Copyright © 2024 MEITEC. All Rights Reserved